低压配电柜检验过程分两部分 |
添加时间:2018/5/10 15:25:07 浏览次数: |
低压配电柜检验过程分两部分: The inspection process of low voltage distribution cabinet is divided into two parts: 一是结构部分检验,即为箱体尺寸检验,如果是标准柜体抽检就可以了。 First, the structural part inspection, that is, the size inspection of the box, if it is the standard cabinet sampling inspection. 二是电气检验,电气方面首先要根据技术图纸核对元器件型号,校验搭接点力矩,并做标识(这项工作很费力,要100%检查),同时注意爬电距离,及相间距离是否符合标准,接线是否符合公司的工艺要求等。然后检查主回路、控制回路是否正确,回路主要用万用表量线。最后是上电测试电气功能是否符合图纸要求,合格与否都要出具检验报告,合格的贴签发货,不合格的返回整改。 The two is electrical inspection. First, the electrical aspects should be checked by the technical drawings to check the components of the components, check the lap moment, and sign (this work is very difficult, 100% check), at the same time pay attention to the distance of climbing, and whether the distance between each other conforms to the standard, the connection is in line with the company's technical requirements. Then check whether the main loop and control loop are correct, and the loop is mainly measured by multimeter. Finally, whether the electrical function is in line with the drawing requirements, whether it is qualified or not, must issue the inspection report, the qualified label delivery, and the unqualified return to the rectification. |
上一页 交流低压配电柜适用条件 |
下一页 低压配电柜保养方法 |
Copyright © 技术支持:遨游网络