配电箱电工接线规范标准
1:将配电柜后板拆出,按照图纸布局安装线槽及导轨,横平竖直,导轨两头与线槽缝隙不得大于2MM(线槽内安装扎线扣)。2:确认元器件型号,按照图纸布局排放元器件并贴上标签。3:接线时须强弱电分开走,避免干扰(左强右弱)。
1: Remove the rear panel of the distribution cabinet and install the groove and guide rail according to the layout of the drawings. The gap between the two ends of the guide rail and the groove shall not be greater than 2MM. 2: Confirm the model of the components, discharge the components according to the layout of the drawings and label them. 3: When wiring, strong and weak electricity should be separated to avoid interference (left strong and right weak).
4:号码管字体方向大小必须统一(由左往右看,由下往上看)。5:压线时线鼻子必须压紧。元器件接线时按照螺丝的顺时针方向拧紧,拧紧后用手拉一下,检查是否会脱落。一个接线孔最多只能接2根线。
4: Number tube font size must be uniform (from left to right, from bottom to top). 5: Line nose must be pressed tightly when pressing line. When wiring components, tighten the screw clockwise. After tightening, pull it by hand to check whether it will fall off. A junction hole can only connect two wires at most.
6:电线颜色使用根据图纸或者客户要求,如果没有要求就使用公司标准 : (380V A黄B绿C红N蓝PE黄绿,220V火线黑色 零线浅蓝色,24v+棕色 0v深蓝色)
6: Use the color of the wire according to the drawings or customer requirements, if not required, use the company standard: (380V A yellow B green C red Nblue PE yellow green, 220V black zero light blue, 24V + brown 0V dark blue)
7:接线完成检查没有错误后装入配电柜,接线过门时须留有弧度,并套缠绕管保护。8:配电柜接线完毕后及时清理柜内垃圾及杂物。
7: Install the distribution cabinet after the wiring has been checked without any errors. When the wiring passes through the door, the radian should be left and the winding pipe should be protected. 8: Clean up the garbage and sundries in the cabinet in time after the wiring of the distribution cabinet is completed.
9:外围人员拿到图纸后先确定传感器的位置及走线方向,diangon.com根据现场位置布置线槽或者扎带扣,线槽内需安装扎带扣。
9: After the peripheral personnel get the drawings, they first determine the position and direction of the sensor. Diangon.com arranges the slots or buckles according to the site location, and the buckles need to be installed in the slots.
10:安装固定传感器并套好号码管,有气管的地方顺着气管走,没有气管的地方贴着固定件走,不能悬空11:走线时尽量将线理顺,不要交叉,穿洞的需要安装保护套,有线槽的地方走线槽,没线槽的套波纹管或者缠绕带,
10: Install the fixed sensor and set up the number pipe. Where there are trachea, follow the trachea. Where there are no trachea, stick the fixed parts to go. No suspension 11: When running, try to straighten out the line, do not cross. If you need to install protective sleeve sleeve sleeve, where there are wired slots, corrugated sleeve or winding belt with no trachea groove, you need to install protective sleeve sleeve sleeve sleeve sleeve sleeve sleeve
12:按钮盒及HMI或者其他需要接线的元器件,如果材料没到货可以先将线放到位,并适当预留足够的长度且套上号码管。
12: Button box and HMI or other components that need wiring, if the material is not delivered, you can put the wire in place first, and reserve enough length and put on the number tube.
13:根据现场位置合理安装集线器,尽量使需要走集线器的14:外部线进入柜内时强弱电分开走,并预留适当的长度。
13: Reasonable installation of hubs according to the site location, as far as possible to take the hubs 14: when the external line enters the cabinet, the strong and weak electricity separately go, and reserve the appropriate length.
15:保持走线美观大方安全不干涉。
15: Keep the line beautiful, generous, safe and non-interference.
16:上电前必须先用万用表检查线路,确保没有接错线后才上电。
16: Before power-on, the circuit must be checked with a multimeter to ensure that there is no wrong connection before power-on.
17:保持工作周围环境整洁,营造一个安全舒适的工作环境。
17: Keep the working environment clean and tidy, and create a safe and comfortable working environment.